Dachshund long, lead hanger 3 hooks

kr 259.00 inc. VAT/ink. moms

In stock

Description

Lead hangers in 1,5 mm powder coated steel with three hooks. Suitable to use for leads, towels, keys etc. Size 14 cm wide x 8 cm tall.

Koppelhängare i 1,5 mm pulverlackerat stål med tre krokar. Lämplig för koppel, handdukar, nycklar etc. Storlek 14 cm bred x 8 cm hög.

Additional information

Weight 75 g